"Up, up, up ... whoa!" came the voice from the roof. "More to the right, down, down ... that's it ... down."
About 120 feet of steel cable away, the operator moves levers and tries to anticipate the moves to drop a 50-foot steel girder in place — vertically — through the roof and down to the floor of the new tasting room for the LAB.
Expect lots more action on Rankin and Lexington Avenues as work continues.
About 120 feet of steel cable away, the operator moves levers and tries to anticipate the moves to drop a 50-foot steel girder in place — vertically — through the roof and down to the floor of the new tasting room for the LAB.
Expect lots more action on Rankin and Lexington Avenues as work continues.
Subscribe to XpressMail. Free Sneak Peek. Every Week.

Want to know what's coming out in Xpress this week before the paper even hits the stands?
We've got your free sneak peek, along with deals available in XpressMail, our weekly email newsletter. (It's the best we can do without time travel.)
-
Comments
-
Related Articles


Comments
No commments yet.
Make a comment
Your comment has been submitted. TODO: Info about moderation
Click here to Comment Again