Close Article Close

NCDOT Inspecting Tunnels on I-40 in Haywood County

User Score

- 0 +
0 comments
841 views
From the NCDOT:

The N.C. Department of Transportation will conduct inspections of three tunnels in the Pigeon River Gorge on Interstate 40 in Haywood County beginning Sunday, July 22, to study possible lighting upgrades. During the inspection, crews will also take the opportunity to examine the structural integrity of the tunnels.

The tunnels being examined are located between the Tennessee border and Exit 15 (Fines Creek). Two of the tunnels are on the eastbound side of the interstate and one is on the westbound side.

All work will take place between 8 p.m. and 6 a.m. During work on the first I-40 East tunnel, the entire tunnel will be shut down and traffic will be routed along an adjacent service road. Work on the other two tunnels will be conducted by shutting down one lane of traffic.

The tunnels on I-40 East will be examined on the following dates:
First tunnel: Sunday, July 22-Wednesday, July 25, and Sunday, July 29
Second tunnel: Sunday, July 29-Wednesday, Aug. 1, and Sunday, Aug. 5-Monday, Aug. 6

The tunnel on I-40 West will be examined on the following dates:
Tuesday, Aug. 7-Wednesday, Aug. 8, and Sunday, Aug. 12-Wednesday, Aug. 15

The investigation work is being conducted by HDR Engineering Inc. of the Carolinas, with traffic control assistance provided by NCDOT and IMAP.

NCDOT reminds motorists to watch signs for construction information, stay alert and obey the posted speed limit.

Subscribe to XpressMail. Free Sneak Peek. Every Week.

Asheville News
Want to know what's coming out in Xpress this week before the paper even hits the stands? We've got your free sneak peek, along with deals available in XpressMail, our weekly email newsletter. (It's the best we can do without time travel.)

We respect your email privacy. More information.

Social Comments
  • Comments

  • Related Articles

Guides

Advertisement

Advertisement

Featured Classifieds from MountainX

0.5564