Duke Energy changes power plans, drops new transmissi­on lines

Responding to a major public outcry against all of the routes proposed for the transmission lines, Duke has reconfigured its plans for upgrading the coal-fired power plan in Skyland. The revised plans eliminate the need for a Campobello, S.C. substation and a high-voltage transmission line connecting that plant with the Asheville facility.