Using data provided by Duke Energy, a local task force has shown that much of the growth in WNC’s peak electrical demand is driven by the conversion of existing oil- and propane-fired heating systems to electric heat pumps. Slowing the growth in peak demand is the mission of the task force, which hopes to delay or eliminate the need for one of three new power plants proposed for Duke Energy’s Lake Julian station.